The new airport in Bangkok Thailand faces a possible shut down

The new airport in Bangkok Thailand faces a possible shut down

The new airport in Bangkok Thailand faces a possible shut down

The new government has found so many things that are not finished inside the new airport that they consider closing it down and finish it.

For example have 1000 lamps already burned out and no program or staff is there to replace them.

The car park does not have rain pipes and when its rain it will get the water to flow in to the elevators.

There is several cracks already visible in the airports runway some that can cause problem some just minor.

The new government report attributed the faults to substandard construction, poor management and manipulation of designs and materials in general.

Even if the threat to close the airport never going to take place heads are going to role from the AOT board members.

 

Give a Comment

Ad Blocker Detected

Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker.

Refresh